• img
  • img
  • img
Candidate Overview
Consultant ID:C25426
Consultant Name: Siva Balabhadrapatruni
Consultant Title:sharepoint DeveloperAdmin
Total Experience:8+ Years
Primary Skills:C#, VB.NET, C, C++ DATABASE : Oracle 11g/10g, SQL Server 2008/2005, MS Access 2000 SCRIPTS : PowerShell 3.0/2.0, VBScript WEB TECHNOLOGIES : ASP, A
Education:Bachelors
Domain Exposure:

IT/Software

Re-Location:Open - anywhere USA
Availability:Immediately
RDM Name:Albert Jordan

View Bench List Portal

Similar candidates

Candidate's Professional Experience Summary

St Jude Children Research Hospital/ ALSAC, TN June 2013 - Present

SharePoint Administrator

Responsibilities:

 Worked on Designing, Configuring and maintaining office 365 Applications.

 Worked on Migration of SharePoint 2013/2010 to SharePoint Online (O365)

 Extensively involved in configuring the User profile, Search, BDC, SSRS, Excel, PowerPivot Service applications

 Build SharePoint Foundation 2013 Farm for Proof of concepts for next migrations move and other tasks.

 Worked on SharePoint server Failover Plan and Windows clustering.

 Involved in Migration Activities using Metalogix tool from SharePoint 2010 to SharePoint 2013/SharePoint online

(O365)

 Worked on Migration of TFS content DB’s to SharePoint 2013 and configuring TFS SharePoint extensions.

 Install & Configure Concept Search and Fast Search implementation.

 Creating Nintex and SharePoint 2013 workflows using Nintex and SharePoint designer.

 Used PowerShell commands and Scripts for most of the Administration and issue fixing

 Configure SSL Certificates in SharePoint 2013 & Fast Search Certificates.

 Migrated MOSS - 2007 to 2010 and SP 2013 by using Database attach and detach method.

 Migrated existing site collections and transition of Document Content management from MOSS 2007 to SP 2010.

 Configured users in Active Directory and populated all the Active Directory users into SharePoint user profiles and

assigned them into various target audiences group.

 Planned for disaster recovery and backup and restore solutions, managed, monitored, and trouble shoot search and

indexing.

 Monitoring SharePoint disk space usage through the built-in SharePoint reports for each site collection.

 Supporting network load balancing needs and ensuring its correct operation (NLB).

 Regular review of the events and messages reported in Event Viewer and Performance Monitor Regular review,

cleanup, management and configuration of SharePoint accounts and sites.

 Setting up alerts and enforcing policies.

Environment:SharePoint 2010/2013 Server, MOSS 2007, WSS(3.0/4.0), .NET Framework 3.0/3.5, SQL Server

2005/2008, IIS 6.0/7.0, Visual Studio .NET 2010, XML, CSS, JavaScript, JQuery, SharePoint Designer 2007/2010/2013,

InfoPath 2007/2010, Windows Server 2003/2008, Active Directory Service.

SONY Electronics, San Jose, CA Jan 2011 – Jun 2013

SharePoint Administrator

Sony Corporation of America, located in New York, NY, is the U.S. headquarters of Sony Corporation, based in

Tokyo, Japan. With some 900 million Sony devices in hands and homes worldwide today, a vast array of Sony movies,

television shows and music, and the PlayStation Network and the Sony Entertainment Network, Sony creates and

delivers more entertainment experiences to more people than anyone else on earth.

Responsibilities:

 Installed and configured Microsoft Office SharePoint Server 2007 (MOSS 2007)/SP 2010 on the threeenvironments

QA, Staging and Production.

 Utilized Central Administration site to manage corporate server farm and created /extended web applicationsto

isolate SharePoint sites.

 Worked on Microsoft Project Server 2010 And 2007.

 Worked on SharePoint infrastructure Engineering.

 Took the database backup of their production site and restored onto other Domain environments.

 Customized and branded master pages using Cascading Style Sheets in SharePoint Designer for SharePointsites.

 The agile process was used to control the implementation process.

 Responsible for Administration, Operations, and maintenance of existing SharePoint farms through all environments

running on SP2010, and a few Legacy applications running on SP2007 and WSS 3.0

 Involved in multiple Deployments through all environments and in Rollback procedures whenever necessary.

 Participated as the only point of contact from the application management team in various Scrum calls, TACC calls,

and incidents opened with Microsoft driving them towards resolution.

 Performing and testing routine SharePoint backups and restores.

 Actively monitoring the Content Deployment jobs, Scheduled Task jobs, Timer Jobs, services, service applications,

Request Resume

laoding
  • * Requester Name:
  • * Requester Email:
  • * Requester Phone:
  • * Position/ Job Title:
  • * Client Name:
  • * Location:
  • * Interview Type:
  • * Max Bill Rate:
  • $  Per Hour
    Market DOE
  • * Contract Type:
  • Corp-To-Corp Contract 1099/ Independent Contract (With Cloud Big Data) Contract-To-Hire

*Job Description Summary:

img img img img img
Conditions of Use | Privacy Notice | © Copyright 1998-2024, Cloud Big Data Technologies or its affiliates